top of page

Post Point Sludge Pump System Replacement
City of Bellingham - $1.6 mill - Completed May 2024
The work for this project consists of modifications and additions to the Owner's dewatered sludge pumping and piping systems located between the existing centrifuges and hearth bed furnaces at the Post Point WWTP solids handling facility. This includes replacement of sludge pumps and hydraulic power units, and fabricated glass lined piping.
bottom of page