Wastewater Lift Station Equipment Replacement

City of Redmond - $4 mill - Completed January, 2024

​Replacement of equipment at five existing wastewater pumping stations, referred to as Wastewater Lift Stations 5, 6, 8, 11, and 15. This includes, but is not limited to: Removal of and replacement of pumping equipment, piping, and appurtenances within existing wet wells and valve vaults; installation and operation of temporary bypass pumping stations; site work including yard piping, fencing, concrete, and HMA paving; modification of electrical power and control systems in outdoor enclosures; removal of and replacement of emergency power generator systems and connection to existing power systems; HMA restoration for trenches and excavations; HMA overlay; landscape restoration; and other work necessary to complete the project.